Author Archives: Big Ted

Bears Are Making Movies

Our friend Katya is here in the studio to help us with our latest film project.  The Bears are hard at work on a music video to the Alien Influence track, Area 51.  As this will involve some chroma keying techniques, I have the important job of ironing out all the creases from the green screen!

Big Ted Ironing Greenscreen

Big Ted ironing the green screen

Watch out for more from the Bears as we work on Area 51!

Back From Our Road Trip

The bears are back from our road trip to Manchester to visit our friend Katya, who has just graduated from Staffordshire University. As Katya is in to film production, including camera work, sound recording and editing, we look forward to working on a film with her in the near future. Here is a picture of me with her business card, which I am just about to add to my collection!

Big Ted with Katya's Details

Big Ted with Katya’s Details

If you want to see some of Katya’s work, you can check her out at the following links:

Help For Heroes Rally Sets Off

Today the Bears were at Littlecote House Hotel for the start of the 2014 Help for Heroes 4X4 Rally. As usual, Hero the bear is supporting the TechyTubbies, as they follow the rally across Europe. The 2000mile / 3200km expedition will encompass 7 European countries over a period of 13 days; concluding in Bavaria, Germany.

2014 H4H TechyTubbies Set Off

2014 H4H TechyTubbies Set Off

The Bears Move In At Last

Bears Move In

Bears Move In With The Essentials


At last, following the successful conclusion of the court hearing by my people yesterday, the bears are finally moving into the studio. Here the guys and I move the essential beer supplies into the new building ready for our first jam session.

Let’s get rocking!

Drive Day 4 Laying the Concrete

Today is concrete day, so we finished off some detailing and waited for the concrete to arrive. As the delivery was later than expected, I entertained the guys from NDC with some beverages and reading tealeaves.

Once the concrete truck arrived it was all mad activity, with me organizing everything to ensure that things were in the right place. The team worked well, and left us with a coloured and imprinted drive.

Finishing off the Shuttering

Day three of the drive rebuild, but the weather forecast is not good, so no concrete pouring today. Instead Ryan and I finished off the shuttering. Here I am during a brief lull in the rain checking the position of the post holders.

Big Ted Checking Post Holders

Big Ted Checking Post Holders

Drive Day 2 Hardcore

Day two of the drive resurface began bright and early with Ryan and the team from New Design Concrete turning up on time and ready to go. First thing after tea-break was to take delivery of a lorry load of hardcore, which I supervised of course.


Once the hardcore was dropped off, the remainder of the old concrete was loaded on to the grab lorry for reprocessing. Efficient hey?

Work Starts on the Drive

Today, work has started on leveling and rebuilding the drive which leads up to the studio. The guys from New Design Concrete (NDC) were here bright and early and started breaking up the old concrete, which did not take much effort it appears to me.

I provided words of wisdom and guidance about the finer points of leveling ground, as usual, as well as ensuring quality.

Led by Ryan, Steve, John and Stefan have been doing most of the hard work, while I supply the beverages (that tea, coffee and coffee extra strong, all white with two sugars!).

The bears are really excited to see the final phase of the studio build under way. After all, we have got to have somewhere to park the limo when we are famous!

Disappointment As Pool Arrives

Our people delivered a pool today but I must say we were disappointed. The name Spa implies bubbles and hot water, and somehow we had been lead to believe that it would be bigger than it is.  Clara was quite underwhelmed too!

You don’t think our people are playing games with us do you?