Day two of the drive resurface began bright and early with Ryan and the team from New Design Concrete turning up on time and ready to go. First thing after tea-break was to take delivery of a lorry load of hardcore, which I supervised of course.
Once the hardcore was dropped off, the remainder of the old concrete was loaded on to the grab lorry for reprocessing. Efficient hey?